SAP C_TS422_2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Outline production planning components and functions, differentiate consumption-based planning vs. MRP
  • Identify repetitive manufacturing specific master data
Topic 2
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 3
  • Outline both motivation and background of SAP S/4HANA
  • Detailed scheduling planning board) and advanced planning
Topic 4
  • Material Requirements Planning in SAP S/4HANA
  • Describe its main components, the lines of business, and the SAP User Experience strategy
Topic 5
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Explain line load planning and confirmation, outline Kanban master data and Kanban processes
Topic 6
  • Explain and compare the different production methods in make-to-order
  • Determine BOM item category, describe order status management and set user statuses
Topic 7
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Identify features for Good Manufacturing Practices (GMP)
Topic 8
  • Select and apply planning strategies, use the planning table, characterize long-term planning
  • Determine master data objects for process orders
Topic 9
  • Identify and explain production relevant master data
  • Outline best practices for using SAP S/4HANA

 

NEW QUESTION 44
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Creation of a purchasing contract
  • B. Change of the material'sprocurement type
  • C. Creation of dependent requirements
  • D. Change of the storage bin
  • E. Creation of a sales order

Answer: B,C,E

 

NEW QUESTION 45
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a reservation.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a production order.

Answer: A

 

NEW QUESTION 46
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Routing
  • B. Repetitive manufacturing profile
  • C. Production cost collector
  • D. Production version

Answer: A,D

 

NEW QUESTION 47
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP controller
  • C. MRP group
  • D. MRP type

Answer: B

 

NEW QUESTION 48
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. The Change Planning Direct on indicator is set.
  • C. Alternative resources are fully occupied.
  • D. The work center has several individual capacities.

Answer: A,D

 

NEW QUESTION 49
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Consumption-based planning
  • B. Manual planning without check
  • C. Material requirements planning
  • D. Forecast planning

Answer: A

 

NEW QUESTION 50
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the production order type
  • C. In the production version
  • D. In the routing
  • E. In the bill of materials (BOM)

Answer: A,B,D

 

NEW QUESTION 51
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Sales Order BOM
  • B. Class BOM
  • C. Functional Location BOM
  • D. Work Center BOM

Answer: A,C

 

NEW QUESTION 52
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Make-to-order production (20)
  • B. Planning with final assembly (40)
  • C. Planning at assembly level (70)
  • D. Planning without final assembly (50)

Answer: D

 

NEW QUESTION 53
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Material Requirements Planning (MRP)
  • B. Capacity Requirements Planning (CRP)
  • C. Demand Planning (DP)
  • D. Supply Network Planning (SNP)

Answer: A

 

NEW QUESTION 54
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.

  • A. Recipe approval (with Engineering Change Management)
  • B. Use of the GMP compliant flag in relevant master data applications
  • C. Documentation of quality data with Quality Management
  • D. Predefined GMP compliant process order types to meet audit requirements
  • E. Use of the digital signature function to check and run business processes

Answer: A,C,E

 

NEW QUESTION 55
Where do you maintain the duration of a producton operation?

  • A. Routing
  • B. Bill of material (BOM)
  • C. Material master
  • D. Work instructions

Answer: A

 

NEW QUESTION 56
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Reduction of associated capacity requirements
  • B. Material staging for next order in sequence
  • C. Archiving of documents for assembly scrap
  • D. Posting of production costs to the production cost collector
  • E. Posting of goods receipt for the product

Answer: A,D,E

 

NEW QUESTION 57
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.

  • A. Using purchasing costs for automated source prioritization
  • B. Using quotations for internal and external procurement
  • C. Using stock transfer reservations for stock transfer
  • D. Using run schedule quantities for in-house production
  • E. Using purchase orders for external procurement

Answer: C,D,E

 

NEW QUESTION 58
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Which transaction you can use to create a new material
  • B. Whether material numbers are assigned internally or externally
  • C. Which material master views can be maintained
  • D. Whether a material master fieldis required, changeable, displayed, or hidden

Answer: C,D

 

NEW QUESTION 59
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Lot size or material cost
  • B. Planned order or materialnumber
  • C. Validity period or sales order
  • D. Alphanumeric or quota arrangement

Answer: D

 

NEW QUESTION 60
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.

Answer: A

 

NEW QUESTION 61
......