NEW QUESTION 47
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Plant
- D. Material
Answer: B,D
NEW QUESTION 48
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION 49
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Posting of production costs to cost collector
- B. Reduction of the capacity requirements
- C. Staging of components for the next order in the sequence
- D. Archiving of backflush documents
Answer: A,D
NEW QUESTION 50
What is the purpose of collective orders?
- A. To post any component withdrawals single back flush with order confirmation
- B. To manage production orders for an entire finished product on multiple levels
- C. To combine order management of co-products and by-products with the main product
- D. To post production costs on a cost collector instead of the production order
Answer: B
NEW QUESTION 51
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Forecast planning
- B. Consumption-based planning
- C. Material requirements planning
- D. Manual planning without check
Answer: B
NEW QUESTION 52
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Quota arrangements
- B. Special procurement keys
- C. Production versions
- D. Outline agreement
- E. Purchasing info records
Answer: B,D,E
NEW QUESTION 53
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:
- A. The MRP Type of the component
- B. The item category of the component in the BOM
- C. The Planning Strategy of the finished product
- D. The Individual/Collective indicator of the component
Answer: C
NEW QUESTION 54
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Assign planned orders manual lying the planning table.
- B. Run MRP with automatic selection of production version.
- C. Run PP/DS heuristics for repetitive manufacturing.
- D. Run MRP with quota arrangement.
Answer: C,D
NEW QUESTION 55
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Make-to-stock production (10)
- C. Planning with final assembly (40)
- D. Planning without final assembly (50)
Answer: C
NEW QUESTION 56
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Whether material numbers are assigned internally or externally
- B. Which transaction you can use to create a new material
- C. Whether a material master field is required, changeable, displayed, or hidden
- D. Which material master views can be maintained
Answer: C,D
NEW QUESTION 57
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. When goods issues can wait for final confirmation
- B. For production lines with short lead times
- C. When you need to determine the work in progress
- D. You require an up-to-date inventory for components
Answer: A,C
NEW QUESTION 58
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. High product complexity
- B. High product stability
- C. Low product complexity
- D. Low product stability
Answer: B,C
NEW QUESTION 59
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.
- A. Scheduling agreement schedule line
- B. Purchase requisition
- C. Stock transport order
- D. Planned order
- E. Production order
Answer: A,B,D
NEW QUESTION 60
Which task list types can have parallel sequences?
There are 2 correct answers to this question.
Response:
- A. Reference operation sets (S)
- B. Routings (N)
- C. Rate routings (R)
- D. Master recipes (2)
Answer: B,C
NEW QUESTION 61
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Manually changing the quantity of a planned order
- B. Creating a planned order within the planning time fence
- C. Assigning a production scheduling profile
- D. Setting a planning time fence in the Material Master Record
Answer: B,D
NEW QUESTION 62
Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question.
Response:
- A. Operation list
- B. Production overview
- C. Production list
- D. Planning file entries
- E. WIP list
Answer: A,B,E
NEW QUESTION 63
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the order using lead time scheduling.
- B. You can reschedule the order using material requirements planning.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the operation using lead the scheduling.
Answer: C
NEW QUESTION 64
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Change planned order quantities
- B. Change sales order quantities
- C. Enter time-ticket confirmation for production orders
- D. Undo for drag & Drop planning activities
Answer: A,D
NEW QUESTION 65
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Concur
- B. SAP Ariba
- C. SAP Field glass
- D. SAP C/4HANA
- E. SAP SuccessFactors
Answer: A,B,C
NEW QUESTION 66
......
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
Updated C_TS422_1909 Tests Engine pdf - All Free Dumps Guaranteed: https://www.itexamsimulator.com/C_TS422_1909-brain-dumps.html