NEW QUESTION 90
An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased in size to accommodate an additional 40,000 ft2 (3716 m3) per floor. The designer's recommendation to the engineer will be to increase the slot area by_____for each additional 40,000 ft3 (3716 m2)
- A. 0.60 m2 (80 in3)
- B. 0.006 m2 (8 in2)
- C. 0.008 m2 (12 in2)
- D. 0.040 m2 (60 in3)
Answer: C
NEW QUESTION 91
The program sponsor returns from a board of directors meeting alter identifying a significant risk to the program schedule. This may Impact the program's benefits realization What should the program manager do next?
- A. Adjust the program scope to avoid the risk
- B. Update the program benefits management plan and risk register
- C. Implement the mitigation plan for the identified risk
- D. Document the risk and create a mitigation plan
Answer: D
NEW QUESTION 92
Company A recently signed a contract with a strategic business partner, Company B, to jointly roll out a new technology Company B is excited about the joint marketing opportunity Company A's component Quality Assurance team has expressed concerns to you the program manager, Ural the product is being rolled out prematurely and has identified potential issues with backend support systems. QA, however, assures you that a manual work around is possible, but not ideal Company B requests an enhancement to the new product. In a meeting with Company B, you determine that additional funding will be required and resources allocated and scheduled What is your MOST appropriate next step?
- A. Advise Company B that funding and resources are not available
- B. Use an integrated change control process
- C. Secure funding from another project that was cancelled
- D. Use the available management reserve
Answer: B
NEW QUESTION 93
A program manager is concerned that a program will be unable to achieve its intended benefits. How should the program manager handle this concern?
- A. Meet with the program stakeholders to determine if a reduction in program scope is acceptable
- B. Meet with the program management office (PMO) lo review critical program success factors.
- C. Meet with the component project managers to perform risk analysis
- D. Meet with the component project managers to reallocate resources within the program
Answer: B
NEW QUESTION 94
Exhibit:
A pay telephone using coins needs to be installed in a public are
a. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair. What will be the maximum reachable height or the value of "X"?
- A. 864 mm (34 in)
- B. 1370 mm (54 in)
- C. 760 mm (30 in)
- D. 1170 mm (46 in)
- E. 1220 mm (48 in)
Answer: B
NEW QUESTION 95
The project managers for component projects A and B schedule the same resource to perform tasks during the same timeframe, resulting in an over-allocation. The program manager reviews the program resource management plan determine that project. A can wait until the resource becomes available, and assigns the resource to project B.
This is an example of which of the following?
- A. Project resource planning
- B. Program resource management planning
- C. Program risk mitigation
- D. Resource interdependency management
Answer: D
NEW QUESTION 96
In order for an ICT distribution designer to identify the BEST solutions for the client's needs they may have to provide
- A. shop drawings
- B. Operation and Maintenance manuals
- C. material lists (e.g., BOM).
- D. subcontractors lists
Answer: C
NEW QUESTION 97
A software company's program manager is conducting closing procedures for a program. At the last steering committee meeting, realized benefits were presented to the program governance board.
What should the program manager do next?
- A. initiate knowledge transfer with the receiving organization, and establish the program integration management plan
- B. Update the financial stakeholder, and contract management plans and archive them in the program information repository
- C. Begin transitioning program resources, and update the resource and program management plans to reflect the change in the program's status
- D. Obtain sponsoring organization approval to begin closeout procedures to transition benefits sustainment to the supporting organization
Answer: D
NEW QUESTION 98
Which of the following is a common application for exothermic welding of earthing (grounding) and bonding conductors?
- A. Bonding to structural steel
- B. Locations requiring monthly maintenance
- C. Cable to cable connections
- D. Connections made to the TBB
Answer: C
NEW QUESTION 99
When planning a telecommunication termination area, what is the estimated space needed to terminate 144 strands of optical fiber?
- A. 10972.82 mm2 (432 a)
- B. 8890.01 mm2 (350 in2)
- C. 7315.21 mm2 (288 in2)
- D. 6350.01 mm2 (250 in2)
- E. 14376.43 mm2 (566 in2)
Answer: C
NEW QUESTION 100
Based on the estimated work area size, what is the MAXIMUM number of work areas that a telecommunications enclosure shall serve?
- A. 0
- B. 1
- C. 2
- D. 3
- E. 4
Answer: B
NEW QUESTION 101
A program manager at a pharmaceutical company plans a new drug development effort. The development is slated to yield three drug variants. The program manager articulates the program scope boundaries.
Which of the following deliverables captures these items?
- A. Program governance plan
- B. Program scope statement
- C. Program scope management plan
- D. Program work breakdown structure
Answer: B
NEW QUESTION 102
A new program manager joins a mufti-year program that has been underway for almost a year. During interviews, several stakeholders state that they do not understand how the program will help the organization At the next stakeholder meeting, what should the program manager present to address their concerns?
- A. Expected program benefits management plan
- B. Program charter
- C. Business case and program roadmap
- D. Program scope assessment results
Answer: C
NEW QUESTION 103
Which of the following is a consideration for lighting telecommunication spaces?
- A. The electrical power for lighting shall be connected to the same electrical panel as the telecommunications equipment.
- B. To ensure worker safety within TEs. Light level requirements are higher tor these than other spaces
- C. The lighting layout shall be coordinated with the equipment and pathway locations
- D. The light fixtures within telecommunications spaces shall be fluorescent type fixtures.
Answer: C
NEW QUESTION 104
A program manager building the world's largest cruise ship is resolving the conflict between the two main sponsors who cannot agree on the number of food and beverage outlets to have onboard. What should the program manager do?
- A. Finalize the business case and market analysis with the cote program team and present the findings to the chief executive officer for approval
- B. Arrange a meeting with both sponsors and the steering committee to present the market analysis and work through the conflict
- C. Work with the core program team to conduct a market analysis and make the decision based on the best return on investment
- D. Engage the program stakeholders present the market analysis and findings to facilitate the decision on the best option
Answer: B
NEW QUESTION 105
What is the lightest-weight metallic conduit manufactured?
- A. EMT
- B. RMC
- C. AMC
- D. IMC
Answer: A
NEW QUESTION 106
Program manager B leaves the program and program manager A takes over the program responsibilities Program manager A wants to ensure that all expected benefits of the program are realized.
What is used to assess the program cost/benefit justification?
- A. Program scope statement
- B. Program charter
- C. Program business case
- D. Benefits management plan
Answer: C
NEW QUESTION 107
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a new system's cost. The program manager has provided monthly performance reports throughout the program's lite cycle.
Which of the following would the customer be interested in reviewing?
- A. Estimate to complete
- B. Cost performance index
- C. Original cost baseline
- D. Estimate at completion
Answer: D
NEW QUESTION 108
The transfer of unwanted signals may occur over one path or several paths. What method addresses the mitigation or suppression of unwanted signals?
- A. The use of unshielded cables
- B. Bonding and grounding
- C. Mounting heights in racks and cabinets
- D. Signal coupling
Answer: B
NEW QUESTION 109
A new program component provides an opportunity to enhance program outcomes. What does the program manager use to document and monitor the opportunity'?
- A. Component project risk registers
- B. Program scope management plan
- C. Program risk management plan
- D. Program risk register
Answer: D
NEW QUESTION 110
......