Updated Jan-2022 Exam DES-6322 Dumps - Pass Your Certification Exam [Q21-Q36]

Share

Updated Jan-2022 Exam DES-6322 Dumps - Pass Your Certification Exam

Latest Real EMC DES-6322 Exam Dumps Questions

NEW QUESTION 21
What is the recommended format for host names when using the VxRail Deployment Wizard for an External vCenter solution?

  • A. FQDN for both vCenter Server and for VxRail Manager
  • B. Host name for both vCenter Server and for VxRail Manager
  • C. Host name for vCenter Server
    FQDN for VxRail Manager
  • D. FQDN for vCenter Server
    Host name for VxRail Manager

Answer: D

 

NEW QUESTION 22
What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-6 (Erasure Coding)?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

 

NEW QUESTION 23
A VxRail 7.0.100 environment is managed by the internal vCenter Server. The customer asks the implementation engineer to deploy a new VxRail cluster using the existing vCenter Server.
What should the response of the engineer?

  • A. Not supported for internal vCenter Server
  • B. Not supported on VxRail software 7.0.100
  • C. Supported by neither the internal vCenter Server nor external vCenter Server
  • D. Only supported on VxRail software 4.7.xxx

Answer: D

 

NEW QUESTION 24
A VxRail API request has been executed and the user account does not have vCenter privileges to perform the task.
What code is returned?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 25
After implementation, the implementation engineer observes errors from both VxRail Manager and vCenter Server. Dell EMC support has requested a log bundle containing only the required log files. Using the simulator, create and download a log bundle for Dell EMC support.
When you have finished, continue to the next question.





Answer:

Explanation:
Pending
Send your suggestions for this question.

 

NEW QUESTION 26
Match each IDRAC Maintenance page tab to its description.

Answer:

Explanation:

 

NEW QUESTION 27
Which service determines the primary node after powering on the VxRail nodes during the deployment of a VxRail cluster?

  • A. Loudmouth
  • B. Mystic
  • C. Marvin
  • D. Election

Answer: C

 

NEW QUESTION 28
An implementation engineer is tasked with setting up RecoverPoint for VMs on a single G Series chassis. How many VMs are licensed to be protected on the cluster?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

 

NEW QUESTION 29
A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.
Which actions need to be performed?

  • A. Verify the configuration settings initially captured in PEQ
    Validate the storage environment
  • B. Validate that no pending and unfinished jobs are running on the servers Verify that the server and storage components are working properly
  • C. Verify VxRail nodes are racked and connected to the ToR switches
    Validate the network environment
  • D. Validate that the latest updates and patches are installed in the system Validate that no pending and unfinished jobs are running on the servers

Answer: D

 

NEW QUESTION 30
What Is a supported method for racking nodes for a new VxRail deployment?

  • A. With PDUs connected to 120v single phase 5-amp electrical circuits
  • B. In the rack hosting the network equipment used to manage the iDRAC
  • C. Starting with node 1 at the top of the rack
  • D. With server exhaust facing the cold aisle

Answer: B

 

NEW QUESTION 31
Match each component of the VxRail HCI System Software to its description.

Answer:

Explanation:

 

NEW QUESTION 32
What is a supported witness configuration for a 3+3+1 VxRail Stretched Cluster?

  • A. Physical ESXi host with multiple VxRail clusters as witness
  • B. vSAN Witness appliance with customer provided license
  • C. Physical ESXi host with included cluster license
  • D. vSAN Witness appliance or a physical ESXi host

Answer: D

 

NEW QUESTION 33
What code is returned when a VxRail API request is executed successfully?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B

 

NEW QUESTION 34
What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?

  • A. Network performance for virtual machines
  • B. Latency measurement between DCs for Stretched Clusters
  • C. Network configuration and performance for vSAN
  • D. Latency and bandwidth measurement to the witness host

Answer: D

 

NEW QUESTION 35
According to Dell best practices, which VxRail series can be deployed in either datacenters or remote locations?

  • A. G Series
  • B. V Series
  • C. D Series
  • D. E Series

Answer: D

 

NEW QUESTION 36
......

DES-6322 Dumps To Pass DCS-IE Exam in One Day : https://www.itexamsimulator.com/DES-6322-brain-dumps.html

100% Guaranteed Results DES-6322 Unlimited 105 Questions: https://drive.google.com/open?id=1r7J0upuxWmRQJ148o70_xu_8ezwQxbaj